EasyManua.ls Logo

Trane Odyssey TTA1504 D Series User Manual

Trane Odyssey TTA1504 D Series
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
March 2020
SSSS--SSVVXX000011AA--EENN
Installation, Operation, and Maintenance
Split System Air Conditioners
Odyssey with Symbio
Controls
Cooling Condenser, R-410A 5 to 25 Tons and
R-22 Dry Charge 7.5, 10, 15 and 20 Tons
((6600 HHzz))
TTA0724*A/D
TTA0904*A/D
TTA1204*C/D
TTA1504*D
TTA1804*C/D
TTA2404*C/D
TTA3004*C
TTA0902*A
TTA1202*A
TTA1802*D
TTA2402*D
((5500 HHzz))
TTA0604DA/D
TTA0764DA/D
TTA1014DC/D
TTA1264DD
TTA1564DC/D
TTA2014DC/D
TTA2514DC
Question and Answer IconNeed help?

Do you have a question about the Trane Odyssey TTA1504 D Series and is the answer not in the manual?

Trane Odyssey TTA1504 D Series Specifications

General IconGeneral
BrandTrane
ModelOdyssey TTA1504 D Series
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Proper Field Wiring and Grounding

Highlights the critical need for qualified personnel and code compliance for electrical safety.

Personal Protective Equipment (PPE)

Stresses the mandatory use of appropriate PPE to prevent injury from hazards.

Safety and Hazard Warnings

EHS Policies and Compliance

Stresses adherence to EHS policies and local regulations for personnel safety.

Refrigerant Pressure and Explosion Hazards

Warns about dangers of high-pressure refrigerant, bypassing safeties, and potential explosions.

Model Number Description

Pre-Installation Procedures

Unit Inspection and Checklist

Outlines steps for inspecting the unit upon receipt and a checklist for pre-installation.

Pre-Installation Mounting and Piping

Unit Mounting and Structural Preparation

Guides on proper unit mounting, including rooftop and ground level installations.

Pre-Installation Electrical Wiring

Electrical Wiring Installation

Covers connecting unit power wiring and system low-voltage wiring.

Refrigerant Piping Installation

Refrigerant Piping Procedures

Outdoor Unit Refrigerant Piping Procedures

Details refrigerant piping procedures for outdoor units, including warnings for R-410A.

Indoor Piping and Leak Check

Indoor Unit Refrigerant Piping and Leak Checks

Covers refrigerant piping for indoor units and procedures for leak testing.

System Evacuation and Line Insulation

Refrigerant Charging

Refrigerant Charging Procedure

Outlines the process for charging the unit with refrigerant, emphasizing liquid charging.

Liquid Charging and Electrical Safety

Liquid Charging and Electrical Safety

Details liquid charging process and crucial electrical safety precautions.

Wiring and Controls

Unit Power Supply and Wiring

Covers providing unit power supply, low voltage wiring, and Symbio controls connections.

Field Wiring

Pre-Start Procedures

Troubleshooting

Control System Troubleshooting

Refers to the Symbio 700 Application Guide for control system troubleshooting details.

Service Test Mode

Maintenance

Related product manuals