EasyManua.ls Logo

Trane Odyssey TTA3004 C Series User Manual

Trane Odyssey TTA3004 C Series
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
March 2020
SSSS--SSVVXX000011AA--EENN
Installation, Operation, and Maintenance
Split System Air Conditioners
Odyssey with Symbio
Controls
Cooling Condenser, R-410A 5 to 25 Tons and
R-22 Dry Charge 7.5, 10, 15 and 20 Tons
((6600 HHzz))
TTA0724*A/D
TTA0904*A/D
TTA1204*C/D
TTA1504*D
TTA1804*C/D
TTA2404*C/D
TTA3004*C
TTA0902*A
TTA1202*A
TTA1802*D
TTA2402*D
((5500 HHzz))
TTA0604DA/D
TTA0764DA/D
TTA1014DC/D
TTA1264DD
TTA1564DC/D
TTA2014DC/D
TTA2514DC
Question and Answer IconNeed help?

Do you have a question about the Trane Odyssey TTA3004 C Series and is the answer not in the manual?

Trane Odyssey TTA3004 C Series Specifications

General IconGeneral
BrandTrane
ModelOdyssey TTA3004 C Series
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction and Safety Precautions

Safety Advisories and Warnings

Defines warning, caution, and notice advisories for safe operation and potential hazards.

Responsible Refrigerant Handling Practices

Emphasizes adherence to refrigerant handling regulations and environmental considerations.

Field Wiring and Grounding Requirements

Personal Protective Equipment (PPE)

Refrigerant Pressure and Explosion Hazards

Model Number Description

Pre-Installation Procedures

Unit Inspection and Testing

Covers inspection for shipping damage, checklist completion, and refrigerant leak testing.

Lifting Recommendations

Unit Mounting and Piping Installation

Unit Mounting Requirements

Details requirements for unit mounting, structural preparation, rooftop, and ground level.

Refrigerant Line Insulation and Electrical Wiring

Electrical Wiring Installation

Ensures proper power wiring, thermostat installation, and connection tightness.

Dimensional Data

Unit Weights

Unit Lifting Points

Installation: Refrigerant Piping Guidelines

Installation: Refrigerant Piping Procedures (Outdoor Units)

Refrigerant Piping and Leak Check Procedures

Leak Check Procedures

Provides warnings and instructions for performing safe leak tests using dry nitrogen.

Installation: Charging Procedures

Installation: Charging Levels

Installation: Charging and Wiring

Field Electrical Wiring

Emphasizes proper field wiring and grounding requirements for safety and code compliance.

Installation: Power and Controls

Symbio™™ Controls Wiring

Explains wiring requirements for Symbio controls, emphasizing copper conductors.

Installation: Symbio™™ Controller Wiring

Installation: Refrigerant Circuit Diagram

Pre-Start: Control Circuit Features

Troubleshooting Guide

Service Test Mode Operation

Maintenance Procedures

Charging Data and Pressure Curves

Wiring Diagram Matrix and Device Location

Warranty Terms and Conditions

Related product manuals