EasyManua.ls Logo

Trane Odyssey TTA0904 A Series User Manual

Trane Odyssey TTA0904 A Series
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
March 2020
SSSS--SSVVXX000011AA--EENN
Installation, Operation, and Maintenance
Split System Air Conditioners
Odyssey with Symbio
Controls
Cooling Condenser, R-410A 5 to 25 Tons and
R-22 Dry Charge 7.5, 10, 15 and 20 Tons
((6600 HHzz))
TTA0724*A/D
TTA0904*A/D
TTA1204*C/D
TTA1504*D
TTA1804*C/D
TTA2404*C/D
TTA3004*C
TTA0902*A
TTA1202*A
TTA1802*D
TTA2402*D
((5500 HHzz))
TTA0604DA/D
TTA0764DA/D
TTA1014DC/D
TTA1264DD
TTA1564DC/D
TTA2014DC/D
TTA2514DC
Question and Answer IconNeed help?

Do you have a question about the Trane Odyssey TTA0904 A Series and is the answer not in the manual?

Trane Odyssey TTA0904 A Series Specifications

General IconGeneral
Model NumberTTA0904 A
Refrigerant TypeR-410A
Voltage208/230V
Phase3
Weight450 lbs
SeriesA Series

Summary

Introduction

Electrical and PPE Safety

Covers field wiring, grounding, and personal protective equipment requirements.

Critical Safety Warnings

EHS Policies and Refrigerant Hazards

Covers EHS policies, high-pressure refrigerant hazards, and explosion prevention.

Pre-Installation Procedures

Unit Inspection and Checklist

Procedures for inspecting the unit upon receipt and a checklist.

Lifting and Clearance Requirements

Guidelines for safely lifting the unit and required clearances.

Pre-Installation: Unit Mounting

Structural Preparation and Mounting

Details roof/ground mounting, structural prep, and installation checklist.

Pre-Installation: Piping and Wiring

Refrigerant Line Preparation

Covers line prep, leak testing, and insulation for refrigerant lines.

Electrical Wiring Connections

Covers power wiring, thermostat, and connection checks.

Installation: Refrigerant Piping

Outdoor Unit Piping Procedures

Details handling R-410A refrigerant and connecting lines for outdoor units.

Indoor Unit Piping Procedures

Covers indoor unit piping connection and brazing.

Leak Check Procedures

Outlines safe methods for performing leak tests.

Installation: Refrigerant Charging

Refrigerant Charging Procedure

Steps for charging the unit with refrigerant, including warnings.

Charging Levels

Installation: Charging and Wiring

Liquid Charging Procedure

Steps for performing liquid charging while the unit is operating.

Electrical Wiring Requirements

Covers field wiring, grounding, and wire sizing.

Unit Power Supply and Controls

Unit Power Supply Connection

Details line voltage connection and disconnect switch requirements.

Refrigerant Circuit

Pre-Start Controls

Troubleshooting

Electrical Safety in Troubleshooting

Emphasizes safety precautions when working with live electrical components.

Service Test Mode

Charging Data and Pressure Curves

Wiring Diagram Matrix

Warranty

Related product manuals