EasyManua.ls Logo

Trane Odyssey TWA0904 A Series User Manual

Trane Odyssey TWA0904 A Series
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
November 2020
SSSSPP--SSVVXX000011BB--EENN
Installation, Operation, and Maintenance
Split System Air Conditioners
Odyssey with Symbio
Controls
Heat Pump Condenser, R-410A 5 to 20 Tons
and R-22 Dry Charge 7.5, 10, 15 and 20 Tons
((6600 HHzz))
TWA0724*A
TWA0724*D
TWA0902*A
TWA0904*A
TWA0904*D
TWA1202*A
TWA1204*A
TWA1204*D
TWA1802*D
TWA1804*D
TWA2402*D
TWA2404*D
((5500 HHzz))
TWA0604DA
TWA0604DD
TWA0764DA
TWA0764DD
TWA1014DA
TWA1014DD
TWA1564DD
TWA2014DD
Question and Answer IconNeed help?

Do you have a question about the Trane Odyssey TWA0904 A Series and is the answer not in the manual?

Trane Odyssey TWA0904 A Series Specifications

General IconGeneral
BrandTrane
ModelOdyssey TWA0904 A Series
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Warnings, Cautions, and Notices

Defines and explains safety advisories used throughout the manual.

Proper Field Wiring and Grounding Required

Emphasizes the necessity of qualified personnel for safe field wiring.

Personal Protective Equipment (PPE) Required

Details the mandatory use of PPE to prevent injury during service.

Model Number Description

Pre-Installation

Unit Inspection

Instructions for inspecting the unit for shipping damage and verifying specifications.

Inspection Checklist

A checklist to ensure the unit is ready for installation.

Testing for Leaks

Procedure for checking refrigerant circuits for leaks before installation.

Lifting Recommendations

Guidelines and warnings for safely lifting the unit.

Clearances

Specifies required clearances around the unit for proper operation.

Unit Mounting

Discusses mounting procedures for units, including rooftop and ground level.

Rooftop Mounting

Specific instructions for mounting the unit on a roof structure.

Ground Level Mounting

Guidelines for securely supporting the unit at ground level.

Installation Checklist

A final checklist to confirm installation completion before operation.

Refrigerant Piping Checks

Checks related to refrigerant line installation and leak testing.

Installation

Leak Check

Procedures and warnings for performing a leak test on the system.

System Evacuation

Instructions for evacuating the refrigerant system to a specified vacuum level.

Refrigerant Charging Procedure

Outlines the steps for charging the system with refrigerant.

Refrigerant Circuit

Pre-Start

Troubleshooting

Service Test Mode

Maintenance

Charging Data and Pressure Curves

Wiring Diagram Matrix and Device Location

Warranty

Related product manuals