EasyManua.ls Logo

Trimax SM3500 - Start of Operation; Battery; Switch-On the Device

Default Icon
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Trimax r
Satellite-Meter ENG 9
Start of operation
Battery
Before the first operation with the measuring device charge the battery
completely. (see also chapter “Lithium-Ion battery” on page 11).
Load the accumulator during the first loading procedure at least 5
hours.
The maximum battery charging time is approximately 12 hours.
Switch-on the Device
Press 2 seconds the red power button on the meter.

Related product manuals