EasyManua.ls Logo

Trinity ET Plus 350 - Page 22

Default Icon
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.highwayguardrail.com 21 Revised: October 5, 2009
3. From the embankment side, insert the bolt
through the strut, the foundation tube, and
the wood post.
4. Place a second washer under a
3
/
4
” (19 mm)
Hex Nut (PN-3704G) on the end of the
inserted bolt.
5. Tighten the nuts to a snug position.
(The
designer does not recommend a torque
requirement.)
Option
B
For channel ground strut
1. Place the slotted yokes of the ground strut
(PN-9852A) over the foundation tubes, at
the base of Posts 1 and 2.
2. Place a
5
/
8
" (16 mm) Round Washer (PN-
3300G) on a
5
/
8
" (16 mm) diameter x 9
1
/
2
"
(240 mm) Hex Head Bolt (PN-3497G).
3. From the embankment side, insert the bolt
through the strut, foundation tube, and the
wood post.
4. Place a second washer under a
5
/
8
" (16 mm)
HGR Hex Nut on the end of the inserted
bolt.
5. Tighten the nuts to a snug position.
(The
designer does not recommend a torque
requirement.)
Note: Do not over tighten the bolts and deform the tubes, this
will complicate possible post replacement.
INSTALLING OFFSET BLOCKS AND RAIL PANELS
The ET-PLUS™ systems use 25’ 0” (7.62 m) rail panels (PN-60G and/or
PN-62G) or 12’ 6” (3.81 m) rail panels (PN-9G and/or PN-32G). The
state/specifying agency standards must be reviewed for what systems to
use.
WARNING: Do NOT bolt the rail panel to the post at location 1 in
any of the ET-PLUS™ systems. Failure to follow this warning
could result in serious injury or death in the event of a collision.
WARNING: Do NOT bolt the rail to the HBA™ post at location 2.
Failure to follow this warning could result in serious injury or death
in the event of a collision.
SPLICING THE RAIL PANELS
Complete the following steps to splice the rail panels:
Step Actions
1.
Lap the terminal rail in the direction of traffic, unless the
state/specifying agency’s policy dictates otherwise.
2.
Splice the rail panels together with eight (8)
5
/
8
” x 1
1
/
4
” (16 mm x
32 mm), HGR Splice Bolts (PN-3360G), and
5
/
8
" (16 mm) HGR
Hex Nuts.
3.
Tighten the bolts. (There is no torque requirement.)
Revised: March 2010