EasyManua.ls Logo

Triumph NTO-10A - Symbols in this Manual

Triumph NTO-10A
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 4 of 20
BOLT BOX CONTENTS
Cable
33’7” Long
7.25” (thread and blank)
4 5/8 Thread
Cable 5/16
½ Stud Threaded
Hole for cable is 5/8 (so can’t use 3/8” Cables)
2 nuts 2 washers
TOOLS TO INSTALL
Hammer Drill
¾” Carbide Drill Bit
Various wrenches, pliers and screwdrivers
Block of Wood
Hammer
Torque Wrench
Tall Ladder
Fork Lift or other method of raising columns and toprails
Electrical connectors to connect 220 volt power unit (use Qualified Electrician)
Level
Chalk Line
Good O-ring Pliers
Grease for column
Chain oil for chains
Vacuum to clean dust from anchor holes
Rags
Allow at least 3-4 hours to set up lift.
SYMBOLS IN THIS MANUAL
Failure to comply with instructions could result in personal injury.
Failure to comply with instructions could result in property damage.
Important Information

Related product manuals