EasyManua.ls Logo

Tru-Test S3 - Installing the indicator

Tru-Test S3
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
3
Installing the indicator
Ensure the indicator is fully charged before use.
1. Mount the indicator onto a post or
crush/chute using the mounting bracket
and mounting kit.
2. Plug the load bar cables into the
indicator, and secure the cables with
cable ties.
3. Power on the indicator.
To install the load bars, refer to the manual that shipped with your load bars.