CHAPTER 2: ASSEMBLY INSTRUCTIONS
BIKE ASSEMBLY STEPS (continued):
Step #15A Console Cable Connections (continued):
*Follow Step 15A if installing a touchscreen console or 15”TFT console. For other consoles, proceed to Step 15B.
15” TFT
NOTE: Ethernet & Coaxial cab
le connections are not available on the Orange LED or 9” TFT Consoles
The Ethernet Port on the 15” TFT Console is non-functioning
All Ground Wires Must be connected
Truefitness.com / 800.426.6570 / 636.272.7100 17
Console
16” Touchscreen
Console
Ethernet Port
Grounding Screw
Coaxial Cable
Power Port
USB