EasyManua.ls Logo

Tuff stuff MSL-IV - Page 15

Tuff stuff MSL-IV
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
F
IG. 49 Begin routing the Pec Dec Cable (#16).Attach one
e
nd of the Pec Dec Cable (#16) to the Pec Dec Cam (#9) and
s
ecure it using one Socket Head Cap Screw 1/4 X 3/4 (#102)
a
nd one Nylon Insert Jam Lock Nut 1/4-20 (#103). Refer to
F
ig. A on page 18 for further detailed illustration of this
a
ssembly.
FIG. 50 Attach one Nylon Pulley 4 1/2 Rd. (#35) to each o
f
the Swivel Pulley Brackets (#25) and secure them using tw
o
Hex Head Cap Screws 3/8-16 X 1 3/4 (#79), four Flat Washer
s
SAE 3/8 (#90) and two Nylon Insert Jam Lock Nuts 3/8-1
6
(#86). Route the Pec Dec Cable (#16) over the Nylon Pulle
y
4 1/2 Rd. (#35), as shown above. Refer to Fig. Aon page 1
8
for further detailed illustration of this cable routing.
F
IG. 51 Insert two Nylon Pulleys 4 1/2 Rd. (#35) into the
O
ffset Pulley Bracket (#23) and secure them using two Hex
H
ead Cap Screws 3/8-16 X 1 3/4 (#79), four Flat Washers SAE
3
/8 (#90) and two Nylon Insert Jam Lock Nuts 3/8-16 (#86).
N
ext, route the Pec Dec Cable (#16) through this bracket, as
s
hown above. Repeat the same procedure in Fig. 49 and Fig.
5
0 to complete the routing of the Pec Dec Cable (#16). Refer to
F
ig. A on page 18 for further detailed illustration of this cable
r
outing.
FIG. 52 Attach the Leg Extension Cable (#15) to the Leg
Extension Arm (#42) and secure it using one Hex Head Cap
Screw 3/8-16 X 1 (#81) and one Nylon Insert Jam Lock Nut
3/8-16 (#86). Refer to Fig. F on page 18 for further detailed
illustration of this cable routing.
Owners’ Manual: Assembly Instruction
s
M
SL-IV Muscle IV Home Gym
14

Related product manuals