IG. 49 Begin routing the Pec Dec Cable (#16).Attach one
nd of the Pec Dec Cable (#16) to the Pec Dec Cam (#9) and
ecure it using one Socket Head Cap Screw 1/4 X 3/4 (#102)
nd one Nylon Insert Jam Lock Nut 1/4-20 (#103). Refer to
ig. A on page 18 for further detailed illustration of this
ssembly.
FIG. 50 Attach one Nylon Pulley 4 1/2 Rd. (#35) to each o
the Swivel Pulley Brackets (#25) and secure them using tw
Hex Head Cap Screws 3/8-16 X 1 3/4 (#79), four Flat Washer
SAE 3/8 (#90) and two Nylon Insert Jam Lock Nuts 3/8-1
(#86). Route the Pec Dec Cable (#16) over the Nylon Pulle
4 1/2 Rd. (#35), as shown above. Refer to Fig. Aon page 1
for further detailed illustration of this cable routing.
IG. 51 Insert two Nylon Pulleys 4 1/2 Rd. (#35) into the
ffset Pulley Bracket (#23) and secure them using two Hex
ead Cap Screws 3/8-16 X 1 3/4 (#79), four Flat Washers SAE
/8 (#90) and two Nylon Insert Jam Lock Nuts 3/8-16 (#86).
ext, route the Pec Dec Cable (#16) through this bracket, as
hown above. Repeat the same procedure in Fig. 49 and Fig.
0 to complete the routing of the Pec Dec Cable (#16). Refer to
ig. A on page 18 for further detailed illustration of this cable
outing.
FIG. 52 Attach the Leg Extension Cable (#15) to the Leg
Extension Arm (#42) and secure it using one Hex Head Cap
Screw 3/8-16 X 1 (#81) and one Nylon Insert Jam Lock Nut
3/8-16 (#86). Refer to Fig. F on page 18 for further detailed
illustration of this cable routing.
Owners’ Manual: Assembly Instruction
SL-IV Muscle IV Home Gym
14