EasyManua.ls Logo

Tuff stuff MSL-IV - Page 16

Tuff stuff MSL-IV
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
F
IG. 53 Insert a Nylon Pulley 4 1/2 Rd. (#35) into the pulley
b
racket on the Base Frame (#2) and secure it using one Hex
H
ead Cap Screw 3/8-16 X 1 3/4 (#79), two Flat Washers SAE
3
/8 (#90) and one Nylon Insert Jam Lock Nut 3/8-16 (#86).
N
ext, insert the Leg Extension Cable (#15) through the Front
U
pright (#3) then through the Nylon Pulley 4 1/2 Rd. (#35), as
s
hown above. Refer to Fig. I on page 17 for further detailed
llustration of this cable routing.
FIG. 54 Next, lift the loose end of the Leg Extension Cabl
e
(#15) up into the Double Pulley Plates 1/8 X 2 X 9 (#21),as
shown above. Refer to Fig. I on page 17 for further detailed
illustration of this cable routing.
F
IG. 55 Insert a Nylon Pulley 4 1/2 Rd. (#35) into the
p
ulley bracket on the Base Frame (#2) and secure it using one
H
ex Head Cap Screw 3/8-16 X 1 3/4 (#79), two Flat Washers
S
AE 3/8 (#90) and one Nylon Insert Jam Lock Nut 3/8-16
(
#86). Next, route the Leg Extension Cable (#15) through the
N
ylon Pulley 4 1/2 Rd. (#35), as shown above.
FIG. 56 Now, lift the loose end of the Leg Extension Cabl
e
(#15) and route it through the Offset Pulley Bracket (#23),a
s
shown above.
MSL-IV Muscle IV Home Gym
15

Related product manuals