26739 - 01/13
rev. 4
ELLPREX
INSTALLATION, USE AND
SERVICING INSTRUCTION
(to be kept by the user)
Question and Answer IconNeed help?

Do you have a question about the Unical ELL 420 and is the answer not in the manual?

Unical ELL 420 Specifications

General IconGeneral
BrandUnical
ModelELL 420
CategoryBoiler
LanguageEnglish

Summary

Product Information and Safety Guidelines

Boiler Selection and Installation

Guidance on selecting, installing, commissioning gas appliances safely and legally.

Boiler Usage and Responsibilities

Proper boiler usage instructions, manufacturer's liability exclusion for misuse.

Safety Regulations and Compliance

Gas Safety Regulations

Legal requirements for gas appliance installation and servicing by registered installers.

Technical Characteristics

Dimensions and Connections (ELLPREX 170-630)

Dimensions and Connections (ELLPREX 760-970)

Dimensions and Connections (ELLPREX 1100-2650)

Dimensions and Connections (ELLPREX 3000-4000)

Dimensions and Connections (ELLPREX 4500-7000)

Connection Specifications

Table detailing connection types, sizes, and pressure ratings for ELLPREX 4500-7000.

Physical Dimensions

Table listing physical dimensions for ELLPREX 4500-7000 models.

Installation Procedures

Boiler Placement

Requirements for boiler placement, ventilation, access, and floor stability.

Water Connections

Chimney Connection

Essential requirements for the chimney's construction and connection to the boiler.

Expansion Vessel and Safety

Connecting expansion vessel and pressure relief valve for system safety and pressure compensation.

Burner Installation and Choice

Burner Conformity and Choice

Burner conformity to directives, selection criteria, adjustment for optimal operation, and flame shape.

Sensor Bulb Installation

Standard Panel Board (Type 21057)

Wiring Diagram (Type 21057)

Wiring diagram illustrating electrical connections for the single-phase burner and pump on the panel board.

Electronic Panel Board (Type 30688)

Wiring and Sensor Connections

Wiring Diagram (Burner & Pumps)

Electrical wiring diagram for single-phase burner and pumps.

Sensor Connection Strip

Diagram showing electrical connections for sensors (boiler, DHW, room, outer) to the outer compensator terminal strip.

Outer Compensator Settings

Technician Programmable Parameters

List of programmable parameters for installation, protected by access code, with value ranges and defaults.

Heating Circuit Parameters

User Programmable Settings

Heating Circuit Programming

Program Settings

Electrical and Hydraulic Connections

CH System Connections

Typical electrical and hydraulic connections for the central heating system with two heating zones.

CH & DHW Production Connections

Electrical and hydraulic connections for central heating and domestic hot water production circuits.

Commissioning and Operation

Turbulator Positioning

Guidelines for positioning turbulators inside smoke pipes for optimal seasonal efficiency and performance.

Preliminary Checks and Commissioning

Pre-Operation Checks

Essential checks before boiler operation: water, electrical, fuel connections, safety devices, and system integrity.

Initial Commissioning

Procedures for initial boiler start-up: burner adjustment, performance checks, and safety device verification.

Boiler Operation and Maintenance

Related product manuals