LEAK DETECTOR INSTALLATION DIAGRAMS
Leak detector installation in single-phase or three-phase Trydan e-Chargers
PE
N
R
T
S
P2
1
J1
P3
P4
PE
N
R
T
S
2
3
1
4
Power
plate
Coil
To carry out the installation, the connector of the leak detector must be placed in the J1 port located on the power board.
Subsequently, the cables coming out of the power board must be routed to the charging hose inside the coil, depending
on the type of installation (single-phase or three-phase). See next page:
P3
P4
Leak
detector
connector