EasyManua.ls Logo

VADA VFB-HM110 - Page 17

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
3. Close the tank isolation valve and then
remove the priming port plug on the top of
the pump casing.
4. Slowly open the tank isolation valve
allowing water to fill the suction line and
pump casing. This will expel the air as the
water fills the suction line and pump casing.
5. Once all air is expelled a steady stream of
water will trickle out.
6. Close the isolation valve and replace the
priming port plug. The isolation valve
must be re-opened prior to operation.
Your pump is now primed. Before pump
operation ensure there is sufficient water
inside the tank.
Solid base
REMOVE
CLOSE
Solid base
REPLACE
OPEN
OPEN
100mm
Solid base
Flow
Isolation
valve

Related product manuals