Task Control parameters
fact that it takes a certain amount of time for the product
to be transported before it reaches the ground. To
compensate for this, you can specify turn-on and turn-off
times.
SC on
time
The time it takes from when a motor starts
up to when the product reaches the ground,
measured in ms (milliseconds). This
means that 1 second will be entered as
1000 (ms), and 1.75 seconds as 1750 (ms).
SC off
time
The time it takes from when a motor stops
to when the product ceases to be delivered,
measured in ms (milliseconds). This
means that 1 second will be entered as
1000 (ms), and 1.75 seconds as 1750 (ms).
Time for
fertiliser
Time for
seed
Time for
micro-
granulate
TPF
1000 300 800
TPR
1000 300 800
TPR
3
1000 300 800
TPT
1000 300 800
TPV
2500 300 800
Note that the above values should only be
considered as guidelines and may need to be
adjusted on site according to prevailing
conditions.