EasyManua.ls Logo

Valor APR-101012 Series - Beginning Awning Assembly and Installation; Initial Assembly and Mounting Setup

Default Icon
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 9 of 14
GEN2-V1 12ft-Instructions (Severe Weather) doc:r1
Right Side operation:
10. BEGINNING AWNING ASSEMBLY & INSTALLATION:
You should now either have a header board installed on your wall or are going to install directly on a masonry
material, but have determine the height the awning should be set at.
Header Board
Vertical Centre Plumb Line Vertical Centre Plumb Line
Set the Intersection point labeled “L
over the Vertical Line and the Plumb line
Align Plumb Line marked on the Wall (or Header) & the
Plumb Line on the Template.
Mark the Centre of the 4-Hole Positions
Set the Intersection point labeled “L
over the Vertical Line and the Plumb line
Align Plumb Line marked on the Wall (or Header) & the
Plumb Line on the Template.
Mark the Centre of the 4-Hole Positions
Mark Horizontal Centre Line
63.50in / 1613mm 63.50in / 1613mm
LEFT WALL BRACKET ASSEMBLY
RIGHT WALL BRACKET ASSEMBLY