Do you have a question about the Vecstar MRF Series and is the answer not in the manual?
Explains danger symbols for electric shock and hot surfaces.
Describes the function of indicator lights for mains power, instruments, and heater status.
Caution on lifting heavy equipment safely from the base with multiple people.
Instructions for checking shipping container, furnace, and retaining original packaging.
Guidelines for placing the furnace on a heat-resistant, ventilated surface.
Details mains connection requirements, voltage, phase, and amperage.
General safety advice, protective clothing, avoiding electrical shock, burns, and personal injury.
States the furnace is for general purpose laboratory and heat treating use.
Explains heating elements, muffle, insulation, temperature control, and safety switches.
Guidance on loading the furnace chamber, avoiding overload, and safety precautions.
Safety requirement for earthing metal probes inserted into the furnace.
Specifies that only inert gases can be used with an optional gas inlet.
Instructions for setting the over-temperature control before starting a heat cycle.
Recommends regular cleaning of soot and scale to maintain furnace efficiency.
States electrical checks by qualified personnel and checking connections for tightness.
Describes Vecstar's repair services available on-site or at their premises.
Details how to order spare parts, requiring serial number, model type, and voltage.
Provides the standard wiring diagram for the furnace.
Provides the wiring diagram for the overtemperature protection feature.