EasyManuals Logo

VENCO VHR 11 Quick Start Guide

Default Icon
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #2 background imageLoading...
Page #2 background image
2013.07 1 / 3
1. INSTALLATION
Download Installation Operation and Maintenance Instructions forum www.venco.com.tr .Read before
start-up the unit and keep it.
During Installation; EN 60204-1 rules should be implemented during the final assembly. Before the
installing of heat recovery units, customers should control whether weight and dimensions of the stations are
suitable for the places from where stations will pass through and assembly will be carried out. There should
be sufficient amount of place around the unit to be able to give service and for piping connections. Heat
recovery units should be assembled onto a hard and flat base.
Figure 1.1. Connection Schematic
INDOOR
Fresh Air
INDOOR
Exhaust Air
OUTDOOR
Fresh Air
OUTDOOR
Exhaust Air
Connection Duct
L = 2 D

Other manuals for VENCO VHR 11

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VENCO VHR 11 and is the answer not in the manual?

VENCO VHR 11 Specifications

General IconGeneral
BrandVENCO
ModelVHR 11
CategoryHeating System
LanguageEnglish

Related product manuals