EasyManua.ls Logo

Vendo V21 821 - Vend Cycle Operation; Vend Cycle Overview

Vendo V21 821
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G-10
06/2005
VEND CYCLE
Several operations take place during the vend cycle: When a selection is made, the
coupler and bucket rotate, product is dispensed and the bucket is then reloaded.
The sequence of these operations change slightly when the column’s depth setting
is changed. With the single depth setting, one purchase is made and the bucket is
reloaded. With the double depth setting, two purchases are made before the bucket is
reloaded. With the triple depth setting, three purchases are made before the bucket is
reloaded. With the quadruple depth setting, four purchases are made before the bucket
is reloaded. (See Figures 8 & 9)
FIGURE 8

Related product manuals