Do you have a question about the VERITAS 5350 and is the answer not in the manual?
Identify the left and right rails labeled LH and RH on the front inside of the rail.
Locate the pins on the front of the rails and place them inside the front of the rack.
Extend the rail assembly to engage the rear rail pins and secure adjuster screws.
Repeat the process for the right rail, verifying alignment and parallelism.
Secure the front and rear of the rail using specified screws and adjuster screws.
Remove plastic film and caps, then lower the shelf onto rack ledges and push it back.
Insert a small screw through the lock tab into the rail's triangular end.
Reattach the left and right caps on the front of the storage shelf.
Remove shelf screws, put on the bezel, and secure with the screws.
Identify and mount the left and right rails into the rack, aligning pins and securing them.
Push the blue lock on the rail toward the rack wall to secure it behind the post.
Identify the three rail types: outer, intermediate, and inner rails.
Extend rails using the white pull tab to release the inner rail from outer/intermediate rails.
Attach the inner rail to the chassis at three points; it clicks into place.
Ensure the outer rail is secure and the intermediate rail is locked forward.
Align the node's inner rail with the rack's intermediate rail and slide it forward.
Pull the blue tab forward to unlock the intermediate rail and slide the node in.
Secure the captive screws onto the node ears for stability.
Angle the bezel's tabs to engage chassis holes and rotate the lock counter-clockwise.
Refer to the Cabling guide to connect hardware after installation.