Do you have a question about the Vertiv XTE 801 Series and is the answer not in the manual?
| Model | XTE 801 Series |
|---|---|
| Mounting | Floor-standing |
| Width | 600 mm |
| Depth | 1000mm |
| Material | Steel |
| Color | Black |
| Rack Units | 42U |
| Protection Class | IP20 |
Defines the safety admonishments used throughout the document.
General safety precautions to observe during handling and installation.
Details required PPE for arc flash, shock, and general safety.
Highlights risks associated with hazardous voltages and de-energizing procedures.
Provides guidance for safely handling static-sensitive components.
Provides an overview of the XTE 802 Series Walk-In-Cabinet (WIC) capabilities.
Details the physical dimensions, weight, and key specifications of the WIC.
Outlines the various features, construction, protection, and interior finishes of the WIC.
General guidance on performing installation procedures in the listed order.
Provides the recommended sequence for installation and start-up procedures.
Lists the necessary tools, test equipment, and materials for WIC installation.
Guidance on obtaining permits and selecting appropriate locations for WIC and generator.
Details the installation of the WIC Helical Foundation Kit.
Details the installation of the WIC Concrete Pier/Pad Foundation Kit.
Details the installation of the WIC On The Ground (Gravity) Foundation Kit.
Installation procedure for helical foundation kits for generators up to 20 KW.
Installation procedure for helical foundation kits for generators up to 30 KW.
Installation procedure for gravity foundation kits for generators up to 30 KW.
Installation of helical platform for WIC and generator combo.
Installation of concrete/gravity platform for WIC and generator combo.
Procedure for installing generator wings on combo platforms.
Procedure for installing elevated platforms for WIC and generator.
Safety precautions for lifting the WIC during transportation and storage.
Safety precautions to avoid equipment damage during unpacking.
General procedures for unpacking and inspecting the WIC upon arrival.
General information regarding lifting the WIC.
Lists the necessary equipment for lifting the WIC with a crane.
Lists the necessary equipment for lifting the WIC with a forklift.
Step-by-step procedure for preparing to lift the WIC.
Critical safety warnings related to lifting the WIC.
Procedure for lifting the WIC using a crane.
Procedure for lifting the WIC using a forklift.
Steps for placing and securing the WIC onto the foundation kit.
Procedure for installing fiber cables and managing them.
Details the location and connection of exterior ground bars.
Procedure for connecting AC input power to the PTLC/ATS.
Defines the DC power cabling color scheme for the WIC.
Provides guidance for installing and wiring batteries.
Procedure for sealing cable entries to maintain WIC integrity.
Details WIC alarms and their connections to alarm blocks.
Checks and prerequisites before initiating the power-up sequence.
Describes the operation of the DAC and HVAC units for climate control.
Guidance on connecting to the controller via Wi-Fi for monitoring and control.
Contact information for technical product and system questions.