EasyManua.ls Logo

VEVOR EEV0 - Step 2: Short and Long Beam Assembly; Step 3: Fixings Assembly

VEVOR EEV0
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 6 -
Step 2: Short and Long Beam Assembly
1. Align short beams (C) & top shelf long beam (D) to aligned notches between
four upright posts (B).
2. Once in position, tap firmly using a rubber mallet.
3. Repeat process for opposite side, ensuring both ends
are set at the same height.
Step 3: Fixings Assembly
Fix fixings(E) at the top of the upright post(B), and tap down to the end.

Related product manuals