3 Handling
3.1 Assembly information
3.1.1 Required material and tools
The following tools are required for mounting:
n flat screwdriver
n spanner (SW 17)
n handsaw
3.2 Assembly
3.2.1 Insert cartridge valve
Requirements:
n the pre-wall element has been mounted
n the tiling work is completed.
n the revision opening is freely accessible
n the urinal ceramic has been mounted
Open the shut-off with a screw driver for a few seconds to rinse the
pipeline.
Re-close shut-off.
Remove seal (SW 17).
Tool
Handling
Visign for More 104 equipment set 8 from 12