59
Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Opening the heat pump..................................................................................................... 60
•
2. Compiling reports.............................................................................................................. 60
•
3. Purging the refrigerant lines and indoor unit.................................................................. 60
•
4. Checking the refrigerant lines for leaks........................................................................... 60
•
5. Evacuating the refrigerant lines and indoor unit............................................................ 61
•
6. Charging the refrigerant lines and indoor unit................................................................ 62
• • •
7. Checking the refrigerant circuit for leaks........................................................................ 63
•
8. Filling and venting the secondary side............................................................................ 64
•
9. Filling and venting the DHW cylinder on the DHW side................................................. 65
•
10. Shifting the cylinder temperature sensor for increased DHW convenience................ 65
• • •
11. Checking the expansion vessel and heating circuit pressure....................................... 65
• • •
12. Testing the anode connection........................................................................................... 66
•
13. Measuring the anode earth current with an anode tester.............................................. 66
•
14. Checking the protective magnesium anode.................................................................... 66
•
15. Replacing the protective magnesium anode................................................................... 67
•
16. Draining the appliance on the DHW side......................................................................... 67
•
17. Cleaning the DHW cylinder............................................................................................... 67
• •
18. Checking the indoor unit electrical connections for firm seating
• • •
19. Checking the fan in the outdoor unit can run freely....................................................... 68
•
20. Cleaning the outdoor unit heat exchanger (evaporator)................................................ 69
•
21. Checking the thermal insulation of flared connections
• •
22. Checking the outdoor unit electrical connections for firm seating............................... 69
• • •
23. Closing the heat pump....................................................................................................... 69
• • •
24. Switching on the power supply........................................................................................ 69
• • •
25. Starting the heat pump...................................................................................................... 70
•
26. Commissioning the system............................................................................................... 70
• • •
27. Checking the heat pump for noise................................................................................... 80
• • •
28. Checking the system function.......................................................................................... 80
•
29. Instructing the system user.............................................................................................. 81
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6199592