Viessmann Vitocal 242-S - Commissioning, Inspection, and Maintenance

Viessmann Vitocal 242-S
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
63
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Opening the heat pump.................................................. 65
•
2. Compiling reports........................................................... 65
•
3. Purging the refrigerant lines and the internal unit with
nitrogen (internal unit is filled with nitrogen; positive
pressure approx. 2 bar/0.2 MPa)
•
4. Tightness and pressure test with dry nitrogen at
43 bara/4.3 MPa
•
5. Evacuating the refrigerant lines and internal unit....... 66
•
6. Charging the refrigerant lines and internal unit.......... 69
• • •
7. Checking the refrigerant circuit for tightness.............. 70
•
8. Filling and venting the secondary side........................ 71
•
9. Filling and venting the solar circuit.............................. 73
• • •
10. Checking expansion vessel and heating circuit
pressure........................................................................... 73
•
11. Cleaning the DHW cylinder............................................ 73
•
12. Replacing the magnesium anode.................................. 75
• •
13. Checking electrical connections of the internal unit
for firm seating
• • •
14. Checking the free running of the fan in the external
unit................................................................................... 75
•
15. Cleaning the external unit heat exchanger
(evaporator)..................................................................... 75
•
16. Checking thermal insulation of flared connections
• •
17. Checking electrical connections of the external unit
for firm seating................................................................ 76
• • •
18. Closing the heat pump; resetting the circuit breaker/
main fuse
• • •
19. Starting the heat pump................................................... 77
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance