5
Commissioning steps
Inspection steps
Maintenance steps Page
•
1. Filling the system on the heating water and DHW side.................................................. 6
• • •
2. Checking connections....................................................................................................... 6
• •
3. System start-up.................................................................................................................. 6
• • •
4. Setting the heating output................................................................................................. 6
• •
5. Setting the pumps.............................................................................................................. 8
• • •
6. Setting the cylinder temperature...................................................................................... 11
• •
7. Shutting down the system................................................................................................. 12
• •
8. Checking the function of the safety valve
• •
9. Inspection and maintenance of the cylinder loading system........................................ 12
•
10. Restarting the system
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5549 892 GB