5
Concrete Pad and Base Installation
Concrete Pad
The concrete pad for operator mounting should be approximately 10”
(255mm) x 12” (300mm) x 18” (460mm) deep in order to provide
adequate weight and structure to insure proper stable installation. Be
sure to position pad so it will not interfere with gate.
Anchors
You can use anchors that provided with the operator,
Anchor bolts (4), Anchors, Washers and Nuts this
anchors must be set in to the concrete at the time of pouring
the concrete pad or you can use wedge anchors (1/4” x 4”) to
fasten the operator.