EasyManua.ls Logo

Viva SKYLO - PART 2: PREPARING THE CISTERN; Remove Inspection Plate; Connect Water Supply; Close Isolation Valve

Viva SKYLO
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PART 2: PREPARING THE CISTERN
Remove the cover cap prior to
completing the wall.
16
Attach the cover over the inspection
plate to prevent debri getting into
the cistern.
15
Ensure that the isolation valve is
closed by twisting it fully to the
right.
10
Remove the inspection plate by
pinching the clips at the top.
8
Connect the water supply to the
1/2” thread near the top right hand
side of the cistern.
9
Lock the drain connector clip
around the drain connector.
12
Insert the toilet hanging threads,
using whichever hole combination
corresponds with the toilet hanging
holes (180mm/230mm). Then slot
the sheaths over the theads.
14
13
Locate and insert both flush pipe
and drain connector blanks into the
corresponding outlets.
Replace the inspection plate.
11