EasyManuals Logo

Vivax ACP-09CH25AEI User Manual

Vivax ACP-09CH25AEI
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
26
5. Set the 2-way valve to the close position.
6. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
7. Set the 3-way valve to the closed position immediately.
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.Disconnect the charge set, and
amount the 2-way and 3-way valves stem nuts and service port caps.Use a torque wrench to tighten the
service port cap.Be sure to check for gas leakage.
6.9 Re-air purging (Re-installation)
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the closed position.
2. Connect the charge set and a charging cylinder to the service port of the 3-way valve.
Leave the valve on the charging cylinder closed.
3. Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45 for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut to on the 2-way valve.
PDF 件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vivax ACP-09CH25AEI and is the answer not in the manual?

Vivax ACP-09CH25AEI Specifications

General IconGeneral
BrandVivax
ModelACP-09CH25AEI
CategoryAir Conditioner
LanguageEnglish

Related product manuals