S
e
r
v
i
c
e
p
o
s
i
t
i
o
n
N
O
T
E
!
Before beginning any service work, the following
measures must first be taken.
1 Position the machine on even, firm and level
ground.
2 Put the attachment on the ground.
3 Turn off the engine. After releasing the system
and tank pressure, remove the ignition switch.
See page
205
.
4 Make sure the control lockout lever is down to
lock the system securely, see page
68
.
5 Pressurized lines and vessels should have the
pressure released gradually to avoid risks.
6 Allow the machine to cool.
A suitable position is stated in the description for the
different service operations. If no particular position
is stated, the machine should be parked in service
position A.
S
e
r
v
i
c
e
p
o
s
i
t
i
o
n
A
Retract the bucket and dipper arm cylinder
completely, and then lower the boom on the ground.
S
e
r
v
i
c
e
p
o
s
i
t
i
o
n
B
Extend the bucket cylinder completely, retract the
dipper arm cylinder completely and lower the boom
on the ground.
S
a
f
e
t
y
w
h
e
n
s
e
r
v
i
c
i
n
g
S
e
r
v
i
c
e
p
o
s
i
t
i
o
n
1
3
5