EasyManua.ls Logo

VQ Models BF-109 50CC - Page 8

VQ Models BF-109 50CC
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4mm
4
Wood dowel (4x30mm)
Wood dowel (4x30mm)
Set the U-style wire through the enlarged hole as below.
U-style wire 130x25mm
Stab joiner
(12x220mm)
1
Stab joiner
(12x220mm)
B=B'
A=A'
A`
A
B`
B
A ccording to thr rib template drill holes to the tail of
fuselage as below.
1
Rib template (2mm ply)
4mm
2
1
Steel wire (0.5x3000mm)
U-style wire 130x25mm
Stab joiner
(12x220mm)
1x20mm
Make sure to glue securely.
If not properly glued, a failure in flight may occur.
Temporarily fasten down the main wing and
check its correct position.
Securely glue together.If coming off during flights,
you'll lose control of your airplane which leads
to accidents!
Drill holes to appropriate position in the stabilizer and
epoxy it to the fuselage as below.
Drill two holes at the stabilizer root base on rib template
and epoxy the wood dowel in them.
Assemble the wings.
1
Stab joiner
(12x220mm)
2
Steel wire (0.5x3000mm)
1
U-style wire 130x25mm
Pin hinge(24x24mm)
6
4
Matal douel (4x30mm)
1
Rib template (2mm ply)
2
Plastical tube(3x30mm)
2
Copper joiner
2
Clevis
2
2
Screw (2x10mm)
Nut (2mm )
2
Washer(2x5mm)
28
29
30
31
32
6
Accessory list for the coming installation steps.
Linkage Stopper
Washer (2mm)
Washer (2mm)
Nut (2mm)
Set screw (3x4mm)
Washer (
2mm
)
Set screw (3x4mm)
1
1
1
1
Assemble the servos and switch.
Drill four holes at the diameters as show
for engine mount.
Assemble the engine.
Washer (5mm)
Screw (5mm)
6.2mm
Blind Nut
4
Blind Nut (5mm)
Fuel supply line
Fuel spray line
Air pressure line
Assembly of the fuel tank.
Mount the fuel tank to the fuselage.
Fuel tank (800cc)
1
Assemble the throttle servo in the fuselage.
57
56
59
60
61
11
58