EasyManua.ls Logo

W'eau WFI-005 - Attention Before Adjustment; Preparation Before Adjustment; Adjustment Process

W'eau WFI-005
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 18 -
7.Adjusting and Initial operation
7.1 Attention
Open the valve of water system, inject water into the system, and exhaust air inside.
Do adjustment after electrical safety inspection.
After the power is switched on, start the test running of heat pump, to check if it can function well.
To avoid dangerous accident, the forced operation is forbidden.
7.2 Preparation Before Adjustment
The system is installed correctly.
Tubes and lines are putted in the right place.
Accessories are installed.
Ensure the smooth drainage.
Ensure the perfect insulation.
Correct connection of ground lead.
The supply voltage can meet the requirement of rated voltage.
Air inlet and outlet function can work well.
Electrical leakage protector can work well.
7.3 Adjustment Process
Check if the switch of the controller can work well.
Check if the function keys of the controller can work well.
Check if the drainage system can work well.
Check if the system can work well after starting up.
Check if the water outlet temperature is in correct situation.
Check if there is vibration or abnormal sound when the system is functioning.
Check if the wind, noise and condensate water produced by the system affect the environment
around.
Check if there is refrigerant leakage.
If any Error codes occur, please check the instructions for the detailed info.