5-68 BA E16 en* 1.0 * E16_10_510.fm
5 Operation
Loading material
Notes on loading site dumpers:
- Position the site dumper so that its cabin is outside the danger zone
of the excavator.
- The loading platform of the truck is loaded by starting at the rear end.
- Keep the swivel angle as small as possible.
- Raise the full bucket to dump height only as you rotate toward the
site dumper.
- Tilt out dusty material with the wind behind you to keep the dust
away from your eyes, air filters and fans.
- If possible, the site dumper and the working direction of the bucket
should form an angle of 45°.
Grading
The stabilizer blade is used for filling up trenches or grading the ground.
Lower the stabilizer blade to the ground for grading work.
Set the depth of the layer you want to remove with the stabilizer-blade
lever.
The vehicle must not be raised by lowering the stabilizer blade.
Do not dig in the vehicle or let it sink in.
Digging position
Place dozer blade A on the side you want to dig.
Fig. 242
Fig. 243
Fig. 244
A

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E16-02 and is the answer not in the manual?

Wacker Neuson E16-02 Specifications

General IconGeneral
BrandWacker Neuson
ModelE16-02
CategoryExcavators
LanguageEnglish

Related product manuals