EasyManua.ls Logo

Wacker Neuson EZ36 - Page 82

Wacker Neuson EZ36
302 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-18 BA E16 en* 1.0 * E16_10_400.fm
4 Putting into operation
Assembly
1. Stop and park the vehicle. Stop the engine see chapter “ Preparing
lubrication” on page 7-9.
K: mounting points top left and right.
2. Install screws L and lock nuts M and tighten to 110 Nm (81 ft.lbs.).
P: mounting points bottom left and right.
3. Install screws Q and tighten to 110 Nm (81 ft.lbs.).
4. Put caps on all screws and nuts.
Fig. 95 (symbolic representation)
Fig. 96
K
L
M
Fig. 97
P
Q

Table of Contents

Related product manuals