40 Series
23
10. CHECKLIST
Check installation and functionality.
See also Operating Instructions.
INSTALLATION
Clean All parts clean before operating roof.
No dirt, dust and small particles.
Examples:
No small particles in rails, guides or
mechanism (from drilling holes for
fixation top frame and rails): causes
damage and corrosion of rails.
No dust in mechanism
(e.g. from sanding wooden parts).
Grease Isoflex
®
Topas L32 grease on inside of
g
uides and rails.
Fuse Correct fuse in wiring.
Alignment rails Position rails
- in accordance with Installation
Instructions
- exactly in line with marine roof and
cut out
- parallel
Sealing Glass panel assembly must compress
seal at complete outline of roof
Function Roof must run smoothly.
Must open and close completely and
correctly.
Open
Close