EasyManua.ls Logo

Weil-McLain CG-5 User Manual

Weil-McLain CG-5
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Otetf&fcl
b<f
55D-tio-l,38'/oi%
UlEIL-flldAIN
CG
(Series
11)
and
CGX
(Series
1)
Gas-Fired
Boilers
Boiler
Manual
Includes:
Installation
Start-up
Service
Boiler
Parts
Refer
to
Control
Supplement
for
additional
information
and
Gas
Control
Parts
For
Natural
or
Propane
Gas
BOILER
MANUAL
FOR
USE
BY
A
QUALIFIED
CONTRACTOR
To
the
owner:
Regular
service
on
this
boiler
is
recommended
and
should
be
performed
by
a
qualified
contractor.
To
the
installer:
Read
all
instructions
and
warranty
before
starting.
Any
claims
for
damage
or
shortage
in
shipment
must
be
filed
immediately
against
the
transportation
company
by
the
consignee.
Part
No.
550-110-630/0695DCP
Question and Answer IconNeed help?

Do you have a question about the Weil-McLain CG-5 and is the answer not in the manual?

Weil-McLain CG-5 Specifications

General IconGeneral
BrandWeil-McLain
ModelCG-5
CategoryBoiler
LanguageEnglish

Summary

Section I: Pre-Installation

COMBUSTION AIR AND VENTILATION OPENINGS

Combustion air and ventilation openings must comply with National Fuel Gas Code ANSI Z223.1.

CHIMNEY OR VENT REQUIREMENTS

Venting must be installed according to National Fuel Gas Code and applicable building codes.

Section II: Boiler Set-Up

HYDROSTATIC PRESSURE TEST

Pressure test before attaching piping or electrical supply. Fill boiler and purge all air.

DRAFT HOOD AND BREECHING INSTALLATION

Secure draft hood and connect breeching to chimney or vent.

Section III: Piping

Section IV: Gas Piping

NATURAL GAS PIPING REQUIREMENTS

Considerations for natural gas piping, including input, pressure, and manifold pressure.

PROPANE GAS PIPING REQUIREMENTS

Requirements for propane gas piping, including pressure and supplier consultation.

Section V: Wiring

GENERAL WIRING SAFETY AND CODES

For safety, turn off power. All wiring must comply with National Electrical Code and CSA standards.

Section VI: Final Adjustments

TO PLACE IN OPERATION

Instructions for boiler start-up, including checks for propane gas boilers.

OPERATIONAL CHECKS AND VENTING INSPECTION

Section VII: Check-out Procedure

PRE-START UP AND IGNITION SYSTEM CHECKS

Verify water, purging, gas piping, orifices, and ignition system shut-off device.

OPERATIONAL AND FINAL VERIFICATION CHECKS

Check high limit, zone flow, gas input, thermostat setting, and completion of installation certificate.

Section VIII: Maintenance

ANNUAL SERVICE CALL AND PRE-SERVICING PRECAUTIONS

Boiler inspection, cleaning, adjustment, and safety precautions before servicing.

MAINTENANCE PROCEDURES

Section IX: Replacement Parts

Related product manuals