EasyManua.ls Logo

Wen 4288T - Assembly & Adjustments; Operation & Maintenance; Exploded View & Parts List

Wen 4288T
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. Part No. Description Qty
1 4288-001 Top Plate 1
2 4288-005 Hook 1
3 4288-004 Water Pot Assembly 1
4 4288-002 Column 1
5 4288-003 Base 1
Hardware Bag (4288-HW)
6 4288-006 Set Screw M10x10 5
7 4288-008 M4x8 Phillips Pan Head Screw 1
8 4288-013 5 mm Inner Hex Wrench 1
9 4288-009 Hex Bolt M8x50 4
10 4288-010 Flat Washer 8mm 8
11 4288-011 Spring Washer 8mm 4
12 4288-012 Hex Nut M8 4
NOTE: The set screws (6) have been pre-installed on the pedestal. The extra hardware bag is provided for mounting
a bench grinder onto the pedestal stand.
1. Slide the column (4) into the base (5); secure by tightening the set screws (6) against the column, using the
included hex wrench. The set screws are pre-installed in the base.
2. Slide the water pot assembly (3) over the column (4). Tighten the set screw (6) to secure the water pot assembly.
(The set screw is pre-installed.)
3. Slide the top plate (1) over the column and secure with set screws (6). The set screws are pre-installed in the
base of the top plate.
4. Secure the base to the floor for maximum stability and safety. (Hardware not included.)
5. Attach the hook (2) using the included Phillips pan-head screw (7) and flat washer.
ASSEMBLY & ADJUSTMENTS
EXPLODED VIEW & PARTS LIST
1
6
3
4
6
5
6
6
8
9
10
11
7
2
6
10
12
7

Related product manuals