Do you have a question about the WFCO T-30 and is the answer not in the manual?
Details time delay, 'break before make' config, shore power availability, ground lug access, and mounting options.
Instructions for connecting the black, white, and ground wires from the shore cord.
Instructions for connecting the black, white, and ground wires from the generator.
Instructions for connecting the black, white, and ground wires to the distribution panel.
Steps for securing the wiring box cover and mounting brackets.
Specific instructions for mounting the T-30WM model to a wall.
The T-57 transfer switch installation is divided into 3 segments: Incoming power, Generator power, Power output.
Connect shore power wires (black, white, red) to the T-57R terminals.
Connect generator wires (black, white, red) to the T-57R terminals.
Connect panel wires (black, white, red) to the T-57R terminals.
Notes on wire gauge, torque, and terminal strip connections for T-57R.
Confirmation that T-30 & T-57R Transfer Switches are ETL Certified to UL 1008 and CSA 22.2.
Details warranty exclusions such as damage from misuse, unauthorized repair, or altered products.
Steps for obtaining warranty service and returning products for evaluation.
Contact information for warranty assistance from dealers or WFCO.