26 Service & Maintenance
MAN0943 (11/1/2013)
Figure 25. PTO Driveline Lubrication Points
Figure 26. Lubrication Points
Daily or every 8 hours of operation
1. Lubricate PTO U-Joints and over-running clutch.
2. Check gearbox daily or every 8 hours of operation.
See Figure 26 for gearbox oil fill location.
Every 25 hours of operation
1. Lubricate PTO driveline telescoping section (one
location, Position B, Figure 25).
2. Lubricate rotor end bearings. (See Figure 27).
A. Daily or 8 hours
B. 25 hours
C. 40 hours
D. Check Daily/Change Annually