EasyManua.ls Logo

Worcester Greenstar Heatslave II ErP 12/18 User Manual

Worcester Greenstar Heatslave II ErP 12/18
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
UK
Installation, Commissioning and Servicing instruction manual
Floor Standing oil-fired Condensing Combination Boiler using Conventional and Room
Sealed Flue
Greenstar Heatslave II
ErP
12/18, 18/25 & 25/32
6720813344-05.1Wo
For fully pumped open vent or sealed central heating systems and domestic hot water cylinders.
These appliances are for use with Kerosene (Class C2) only.
6 720 813 344 (2014/09)

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Worcester Greenstar Heatslave II ErP 12/18 and is the answer not in the manual?

Worcester Greenstar Heatslave II ErP 12/18 Specifications

General IconGeneral
ModelGreenstar Heatslave II ErP 12/18
CategoryBoiler
ManufacturerWorcester Bosch
Fuel TypeOil
Output Rating12-18 kW
ErP RatingA
Boiler TypeCombi
MountingFloor standing
CH Output (kW)12 - 18
DHW Output (kW)18 kW
Warranty5 years

Summary

Installation Regulations

Complying with Building Regulations

Details legal requirements and compliance with building codes for installations.

Pre-Installation

Flue Options

Installation requirements for conventional and room sealed flues.

Installation

Pipework Positions and Flue Opening

Specifies positions for pipes and the required flue opening.

Boiler Installation

Steps for installing the boiler unit onto its mounting.

Flue Installation

Instructions for connecting and installing the flue system.

Pipework Connections

Detailed connections for water, oil, and condensate pipes.

Oil Burner and Pump Installation

Instructions for installing and checking the oil burner and pump.

Electrical Safety and Connections

Safety precautions and wiring for electrical connections.

Electrical Schematic

Wiring diagram for the boiler's electrical system.

Commissioning

Pre-Commissioning Checks

Checks to perform before starting the commissioning process.

Filling the System

Procedure for filling the heating system with water.

Starting the Appliance

Steps for safely starting the boiler for the first time.

Pre-Commissioning Boiler Checks

Final checks and adjustments for commissioning.

Finishing Appliance Commissioning

Final steps to complete appliance commissioning.

Service and Spares

Inspection and Service Procedures

General guidance for routine inspection and servicing.

Burner Cleaning and Maintenance

Steps for cleaning the boiler's burner assembly.

Fault Finding and Diagnosis

Cause and Fault Codes Table

Table listing fault codes, causes, and solutions.

Frost Protection Functions

How the boiler protects against freezing.

Riello Digital Control Box Fault Finding

Fault finding logic for Riello control boxes.

Related product manuals