EasyManua.ls Logo

Worcester ZB 7-28 HE system

Worcester ZB 7-28 HE system
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Operating the Appliance
6 720 610 577 GB (03.02)
3 Operating the Appliance
3.1 Preparation
Turn on the gas cock (172).
B Press in the handle and turn it anti-clockwise as far as the stop
(when handle is in line with direction of flow, the cock is open).
Central heating system valves (170)
B Using a spanner, turn square nut until groove is in line with
direction of flow (see detail).
Groove at right angles to direction of flow = off.
Cold water inlet valve (173)
B Turn handle so that it is in line with direction of flow.
When handle is at right angles to direction of flow, the valve is
closed.
170
172
173
6 720 610 577-02.1O

Related product manuals