EasyManuals Logo

Worcester ZWB 7-30 HE combi User Manual

Worcester ZWB 7-30 HE combi
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
10
Operating the Appliance
6 720 610 577 GB (03.02)
3 Operating the Appliance
3.1 Preparation
Turn on the gas cock (172).
B Press in the handle and turn it anti-clockwise as far as the stop
(when handle is in line with direction of flow, the cock is open).
Central heating system valves (170)
B Using a spanner, turn square nut until groove is in line with
direction of flow (see detail).
Groove at right angles to direction of flow = off.
Cold water inlet valve (173)
B Turn handle so that it is in line with direction of flow.
When handle is at right angles to direction of flow, the valve is
closed.
170
172
173
6 720 610 577-02.1O

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Worcester ZWB 7-30 HE combi and is the answer not in the manual?

Worcester ZWB 7-30 HE combi Specifications

General IconGeneral
BrandWorcester
ModelZWB 7-30 HE combi
CategoryBoiler
LanguageEnglish

Related product manuals