EasyManuals Logo

Xiaomi G10 Plus User Manual

Xiaomi G10 Plus
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
7
Installing the 2-in-1 Charging & Storage Mount
1. The 2-in-1 charging & storage mount should be installed in a cool, dry place with an electrical outlet nearby. Prior to installing, ensure that there are not any wires
or pipes in the space directly behind where the mount will be installed.
2. The bottom of the mounting template sticker should be level and at least 1.03 m from the ground, and its top should have at least 30 cm of clearance above it.
3. Use a power drill with an 8 mm drill bit to drill a hole into each hole marker on the mounting template sticker, then insert a wall plug into each hole.
4. Align the mounting holes on the 2-in-1 charging & storage mount to the holes on the wall, then attach the mount to the wall using the included screws.
Recommended Height: At least 1.03 meters from the ground
The replaceable battery is not
included and purchased separately.
*
Extended Dock Charging Plate
Extended Dock
Located on the top of the 2-in-1
charging & storage mount and used
for installing the battery pack*. It
supports charging the battery pack
together with the vacuum cleaner.
103 cm
30 cm

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Xiaomi G10 Plus and is the answer not in the manual?

Xiaomi G10 Plus Specifications

General IconGeneral
BrandXiaomi
ModelG10 Plus
CategoryVacuum Cleaner
LanguageEnglish

Related product manuals