EasyManua.ls Logo

Yardline RIDGEPOINTE - Page 39

Yardline RIDGEPOINTE
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
3" (7,6 cm)
FRONT GABLE LADDERS
PARTS REQUIRED:
x4
x32
HINT:
Pre drill to avoid

x6
2 x 3 x 5-1/2" (5,1 x 7,6 x 14 cm)
URB
x2
2 x 6 x 3-5/8" (5,1 x 15,2 x 9,2 cm)
LUA
x2
2 x 6 x 5-1/4" (5,1 x 15,2 x 13,3 cm)
AYB


Screws
HPP
URB x3
Arrange, measure and mark locations of (3) URB as shown place HPP
on top. Secure with 3" screws as shown .
Ensure parts are ush along edges.
2
3
4
1
BEGIN

Flush
Flush
2-1/2"
(6,3 cm)
Flip over gable ladder sub-assembly and fasten
HPP to (3) URB with 3" screws .
Assemble AYB to LUA with (2) 3" screws .
Install L-block between HPP with (2) 3" screws in both
sides .
Pre-drill all holes.
Turn L-block so it is ush with corner angle of HPP.
Repeat steps to build the 2nd gable ladder.

HPP
Flush


Screws
2 x 3 x 83-13/16" (5,1 x 7,6 x 212,9 cm)
58"
(147, 3 c m)
28"
(71,1 cm)
2-3/4"
(7,0 cm)
83-13/16"
(212,9 cm)
3-5/8" (9,2 cm)
5-1/2"
(14 cm)
LUA
AYB



Screws
Flush

HPP
3/16" (4,8 mm) Drill Bit