Do you have a question about the YILKAR YK 100 and is the answer not in the manual?
General safety rules for operating the YK 100 air conditioner.
Details and location for air conditioning gas charge fittings.
Operation of the digital control panel in cooling mode.
Operation of the digital control panel in heating mode.
Operation of the digital control panel in waiting/ventilation mode.
How to adjust the internal temperature using the control buttons.
How to operate the evaporator fan speed and airflow.
Description of optional features like fresh air intake.
Key considerations when ordering replacement parts.
Verify roof compatibility and structural integrity before installation.
Prepare roof, make openings, and position unit centrally.
Disconnect battery, check for cables, and make holes between roof ribs.
Fasten unit to roof and connect drainage hoses.
Connect hoses to vehicle, compressor, and YK 100 unit.
Install control unit, test system, and reassemble components.
Refrigerant work must be done by authorized garages and qualified personnel.
Inspect after 1500 km, check belt tension, and clean components.
Keep doors closed during operation; run unit monthly for long storage.
Regularly check and clean condenser battery fins and fans.
Inspect all components seasonally; replace receiver drier if needed.
| Type | Split Air Conditioner |
|---|---|
| Power Supply | 220-240V, 50Hz |
| Energy Efficiency Ratio (Cooling) | 3.2 |
| Noise Level (Outdoor) | 52 dB(A) |
| Operating Temperature (Cooling) | 18°C to 43°C |
Loading...