EasyManua.ls Logo

YitaHome FTPLSS-4001 - User Manual

YitaHome FTPLSS-4001
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
ASSEMBLY INSTRUCTIONS
TOOL ROOM
TZAB-V1
FTPLSS-4001
FTPLSS-4002
FTPLDB-4016
FTPLDB-4017
FTPLDB-4018
FTPLDB-4019
FTPLDB-4020
FTPLDB-4021
Question and Answer IconNeed help?

Do you have a question about the YitaHome FTPLSS-4001 and is the answer not in the manual?

Summary

Component Identification and Parts List

Detailed Parts List

Comprehensive list of all components and their quantities for assembly.

Pre-Assembly Preparation and Safety

Workspace Preparation and Safety Notes

Instructions for organizing parts and preparing the workspace for a smooth build.

Assembly Breakdown Diagram

Key Assembly Steps

Base Frame Construction (Step 1)

Construct the foundational base frame using specified parts and fasteners.

Corner Post Integration (Step 3)

Integrate vertical corner posts into the base structure for stability.

Wall Panel Attachment (Step 6)

Secure the main wall panels to the erected frame.

Roof Panel Installation (Step 13)

Attach the primary roof panels to the top of the structure.

Door and Trim Fitting (Step 20)

Install the door components and exterior trim pieces.

Final Assembly and Latch (Step 26)

Complete the assembly by fastening final elements and installing the door latch.

YitaHome FTPLSS-4001 Specifications

General IconGeneral
Frame MaterialSteel
Cushion MaterialPolyester
Weather ResistanceYes
Assembly RequiredYes
IncludesCushions

Related product manuals