EasyManua.ls Logo

York YFE36B21S - System Charge for Various Matched Systems

York YFE36B21S
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5495499-YTG-B-0219
4 Johnson Controls Ducted Systems
CHARGING PROCEDURES:
1. Check the Factory Unit Charge listed on the unit nameplate to verify the refrigerant charge for the outdoor unit, the smallest matched indoor unit, and the 15 feet
of interconnecting lineset.
2. Verify the indoor metering device and additional charge required for the specific matched indoor unit in the system using the above table.
3. Add additional charge for the amount of interconnecting lineset greater than 15 feet at the rate specified in the Physical and Electrical Table.
4. For installations requiring additional charge, weigh in refrigerant for the specific matching indoor unit and actual lineset length.
5. Once the charge adders for matched indoor unit and for lineset have been weighed in, verify the system operation against the temperatures and pressures in the
Charging Chart for the outdoor unit. Locate Charging Charts on the outdoor unit and also in the Service Data Application Guide on
www.simplygettingthejobdone.com. Follow the Subcool or the Superheat charging procedure in the Installation Manual according to the type of indoor metering
device in the system, and allow ten minutes after each charge adjustment for the system operation to stabilize. Record the charge adjustment made to match the
Charging Chart.
6. Permanently stamp the unit data plate with the TOTAL SYSTEM CHARGE defined as follows: TOTAL SYSTEM CHARGE = Base Charge (as shipped) + charge
adder for matched indoor unit + charge adder for actual lineset length + charge adjustments to match the Charging Chart.
SYSTEM CHARGE FOR VARIOUS MATCHED SYSTEMS
Outdoor Unit YFE18B21S YFE24B21S YFE30B21S YFE36B21S YFE42B21S YFE48B21S YFE60B21S
Required TXV
1,2
1. For applications requiring a TXV, use S1-1TVM*** series kit.
2. A TXV kit must be used with these indoor units to obtain system performance.
BA1 or BH1 BA1 or BH1 BB1 BC1 or BA1 BC1 BC1 BD1
Indoor Unit
3,4,5
3. Systems matched with furnaces or air handlers not equipped with blower-off delays may require 60 second time delay.
4. CF coils cannot be used in horizontal applications.
5. Charge adders shown above do not indicate that coils are rated for every application. Refer to Performance Data Tables for actual performance for specified sys-
tem matches. Obtain certified system ratings from
www.ahridirectory.org.
Additional Charge, oz
AP18B 0––––––
AP24B 30–––––
AP30B 10 72––––
AP36B 10 720–––
AP36C 11 22–––
AP42C 11 220––
AP48(C,D) –––520–
AP60(C,D) ––––920
AE18B 0––––––
AE24B 30–––––
AE30B 850––––
AE36(B,C) 10 720–––
AE42C –––52––
AE48(C,D) –––520–
AE60C ––––920
AE60D ––––292220
AVC18B 0––––––
AVC24B 30–––––
AVC30B 850––––
AVC36(B,C) 10 720–––
AVC42C –––52––
AVC48(C,D) –––520–
AVC60C ––––920
AVC60D ––––292220
CF/CM/CU18(A,B) 0––––––
CF/CM/CU24(A,B) 30–––––
CF/CM/CU30(A,B,C) 850––––
CF/CM/CU36(A,B,C,D) 10 720–––
CF/CM/CU42(B,C,D) 11 220––
CF/CM/CU48(C,D) –––520–
CF/CM/CU60(C,D) ––––920
CF/CM64D ––––292220
Some of the combinations shown in the above System Charge table require Advanced Main Air Circulating Fan indoor product. For approved coil
only matches, please see the “COOLING CAPACITY - Upflow, Downflow & Horizontal Furnaces and Coils” table.
FOOTNOTES:

Related product manuals