5188236-BIM-A-0316
Johnson Controls Unitary Products 11
Figure 9: ZD-03 Thru -05 Unit Side Duct Openings
Figure 10: ZD-03 Thru -05 Roof Curb
Table 5: ZD-03 Thru -05 Utilities Entry
Hole Opening Size (Dia.) Used For
A7/8 KO
1
1. Opening in the bottom to the unit can be located by the slice in the
insulation.
Control Wiring
2
2. Do not remove the 2” knockout ring.
Side
Bottom
B2 KO
1
Power Wiring
Side
Bottom
C 1-5/8” KO Gas Piping (Front)
D 1-1/2” KO Gas Piping (Bottom)