EasyManua.ls Logo

Zareba AC POWERED - Page 3

Zareba AC POWERED
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 3 -
WARNING: Check local zoning laws for electric
fencing guidelines in your area. Also check with local
utilities before digging to identify any buried cables or
natural gas lines.
In a double-insulated controller, two systems of
insulation are provided instead of grounding. No
means of equipment ground is provided in the supply
cord of a double-insulated controller, nor should a
means for equipment grounding be added to the
controller. Servicing of a double-insulated controller
requires extreme care and knowledge of the system,
and should be done only by qualified service personnel.
Replacement parts for a double-insulated controller
must be identical to the parts they replace.
Tools Required
• Wire cutter/stripper (part no. FWC-1)
• Flathead and phillips screwdrivers
• Adjustable wrench
• Voltage tester (part no. DEFT-1 or RSVT8)
Other Required Components
• Two lengths of 20 KV insulated hook-up wire (one long
enough to connect fence controller to ground system
and one long enough to connect fence controller to
fence line)
• Fence line connector (part no. 07110-96 for steel or
poly wire; PRS2 for poly rope; or PTCC1 for poly tape)
• 6- to 8-foot ground rod(s) (part no. GR8 or 07104-96)
• Ground rod clamps–one per ground rod (part no.
CGR1 or 07105-96)
USmanual-AC.indd 3 6/24/2010 4:30:06 PM

Related product manuals