EasyManua.ls Logo

ZEIA PHANTOM FX-61 - Aircraft Adjustment and Testing; Battery Installation and Transmitter Setup; Linkage Adjustment and Fixing; Control Direction Test

ZEIA PHANTOM FX-61
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.1 Installing battery
A Turn on the transmitter.(Notice:
Put the throttle stick
and
trim in the lowest location
and center other
trims)
A lnstall the
battery
in the fuselage and complete the connection.
2.3 Control
Direction
Test
Move the controls
on the transmitter
to
make sure the aircraft control
surfaces move correctly. After doing
the Control
Test,
correctly
set
the failsafe. Make
sure the transmitter
controls
are at neutral and
the throttle and throttle trim are
in the low
position.
L Notice: Turn on the
delta
mixer switch.
TIP: If
you
want
to fix the clevis tightly.
€D
Adjust the linkage as below:
1
+-u
"
""----_,
# 121104